• Supplying The UK Since 1972

    Supplying The UK
    Since 1972

  • Delivered From Stock Within One Week

    Delivered From Stock
    Within One Week

  • Quality Products Manufactured In The UK & Europe

    Quality Products Manufactured
    In The UK & Europe

  • Technical Support With System Advice

    Technical Support With
    System Advice

  • Supplying The UK Since 1972

    Supplying The UK
    Since 1972

  • Delivered From Stock Within One Week

    Delivered From Stock
    Within One Week

  • Quality Products Manufactured In The UK & Europe

    Quality Products Manufactured
    In The UK & Europe

  • Technical Support With System Advice

    Technical Support With
    System Advice

Wall Mounted Substation for Domestic Hot Water ( DHW) and Central Heating working together c/w Template

Quantity of WALL MOUNTED SUBSTATION FOR DOMESTIC HOT WATER ( DHW) AND CENTRAL HEATING WORKING TOGETHER C/W TEMPLATE required
  • Secondary Flow Rate L/S

    0.19

  • Secondary Pressure Drop Kpa

    4

  • KW Required

    39.5

  • Heat Model

    AEL-R134TS-DHW-CH-SERIES-WMS

  • Primary Maximum Working Pressure bar

    16

  • Heat Exchanger Material

    Stainless Steel (316)

  • Function

    Central Heating and Domestic Hot Water (DHW)

  • Heating Primary Water Flow Rate l/s

    0.644

  • Heating Primary Water Flow IN and OUT Temperature oC.

    85 > 70

  • Heating Primary Water Pressure Drop KPA

    24

  • Central Heating Water Flow Rate l/s

    0.385

  • Central Heating Water Flow IN and Out Temperature oC

    55 > 80

  • Central Heating Pressure Drop KPA

    9

  • DHW Primary Water Flow IN Flow Rate l/s

    0.385

  • DHW Primary Water Flow IN & Out Temperature oC

    80 > 55

  • DHW Primary Water Pressure Drop KPA

    16

  • Secondary DHW Water Flow IN and OUT Temperature oC

    10 > 60

  • Pipework Connections CH

    CENTRAL HEATING 3/4"

  • Pipework Connections DHW

    DHW 1/2"

Please click on the image to enlarge the view