• Supplying The UK Since 1972

    Supplying The UK
    Since 1972

  • Delivered From Stock Within One Week

    Delivered From Stock
    Within One Week

  • Quality Products Manufactured In The UK & Europe

    Quality Products Manufactured
    In The UK & Europe

  • Technical Support With System Advice

    Technical Support With
    System Advice

  • Supplying The UK Since 1972

    Supplying The UK
    Since 1972

  • Delivered From Stock Within One Week

    Delivered From Stock
    Within One Week

  • Quality Products Manufactured In The UK & Europe

    Quality Products Manufactured
    In The UK & Europe

  • Technical Support With System Advice

    Technical Support With
    System Advice

Wall Mounted Substation for Central Heating only c/w Installation Template

Quantity of WALL MOUNTED SUBSTATION FOR CENTRAL HEATING ONLY C/W INSTALLATION TEMPLATE required
 Please adjust the KW shown below to provide the secondary flow rate required
  • KW Required *
  • Secondary central heating hot water flow rate L/S

    0.551

  • Secondary central heating hot water flow IN Temperature °C

    55

  • Secondary central heating hot Water Flow OUT Temperature °C

    70

  • Secondary Pressure Drop Kpa

    12

  • Primary flow rate L/S

    0.554

  • Primary oC

    85

  • Primary Water Flow OUT Temperature °C

    70

  • Primary Pressure Drop Kpa

    13

  • Heat Model

    AEL-R34T.CH-WMS

  • Primary Maximum Working Pressure bar

    16

  • Heat Exchanger Material

    Stainless Steel (316)

  • Secondary Maximum Working Pressure bar

    2.7

  • Primary Pipework Connections

    1"

  • Secondary Pipework Connections

    3/4"

Please click on the image to enlarge the view