• Supplying The UK Since 1972

    Supplying The UK
    Since 1972

  • Delivered From Stock Within One Week

    Delivered From Stock
    Within One Week

  • Quality Products Manufactured In The UK & Europe

    Quality Products Manufactured
    In The UK & Europe

  • Technical Support With System Advice

    Technical Support With
    System Advice

  • Supplying The UK Since 1972

    Supplying The UK
    Since 1972

  • Delivered From Stock Within One Week

    Delivered From Stock
    Within One Week

  • Quality Products Manufactured In The UK & Europe

    Quality Products Manufactured
    In The UK & Europe

  • Technical Support With System Advice

    Technical Support With
    System Advice

Instantaneous Plate & Gasket (SP) Swimming Pool Heat Exchangers

 Changing the pool volume will increase or decrease the KW required to heat your pool over a 72 hour period
  • Pool Water Volume Litres *
  • Secondary Pool Water Flow rate L/S From Cold

    0.04

  • Secondary Pool Water Flow IN Temperature °C

    10

  • Secondary Pool Water Flow OUT Temperature °C

    28.5

  • Secondary Pressure Drop KPA

    6

  • Primary oC

    80

  • Primary Water Flow OUT Temperature °C

    50

  • Primary Pressure Drop Kpa

    2

  • Heat Model

    AEL-TSC510-P5HH-SP

  • Primary Maximum Working Pressure bar

    10

  • Pool Water Volume Meters Cubed m3

    10

  • Pool Heat up Period from 10 oC

    72

  • Primary Heat Source KW Power Required

    3

  • Primary Pool Water Flow rate L/S From Cold

    0.02

  • Primary Pipework Weight Kg

    24

  • Pool Water Pipework Connections

    1 1/4"

Please click on the image to enlarge the view

Download Our Product Details